Introduction - Key Methods and Risk Management in Tasman House Construction
The proposal for the construction of the Project planning will be demonstrated based on different strategies and in this report, it has been very clearly expressed that the logic that is used for the methodology is defined properly by integrating all the key elements of the requirements of the projects. The proposal is based on the topic of construction of Project Planning Report Tasman House and the development features of the current building are the proposal that is proposed and this report for welding the new project. this will create a big impact on the “Wall Street” Characteristics of the area. There are various reconstruction processes that are used for building the current project by demolishing the part of the reconstruction. a new structure is also developed that describes the six stories building including a sixth-floor hall and store room on the ground floor (King, and Leach, 2021). It is also considered of various amenities in the basement as well as landscaping in the rooftop. the report is proposed for organizing the result properly which would gain overall space for the installation of the sixth-floor building. The construction will be done on the wall Street by packaging the parapet from ground level to 5th level and the structure is also organized for promoting sustainable development.
Looking for top-notch assignment help? Get Online Assignment Help UK Across All Cities with Native Assignment Help. Our expert tutors are ready to assist with your academic needs, whether you're in London, Manchester, Birmingham, or anywhere else in the UK.
Methods Used
The construction method will be used in building the project by the professionals for creating the houses or buildings and the construction method is used for deciding the usage of the projects that could depend on the factors like cost of the project, availability of the materials, and the expectations team that would construct the building based on the chosen location. There are different construction processes that are very important for the architects to know about which construction process needs to be used in this construction process. This helps in creating the model as well as the design of the construction for planning the projects so that they can create a safe environment for the workers (King, 2022). It is also used for interviewing the information about the positions depending on the field of construction process. The method for creating concrete walls and floors is used by professionals and it is also known as cement floors in the construction site. the architect will use a special tool for allowing the concrete wall as well as the floor for creating a smooth texture and proper finishing of the construction.
The concrete walls as well as the floors have different advantages as low production cost and it also requires minimal maintenance. The architect will be using this method in this project by including the basement as well as the ground floor for the industrial buildings. The risk register is a very important tool in constructing projects as it helps in facilitating by identifying the systematic risk that could be used for developing the management process throughout the lifecycle of the project (Nath, Dewsbury, and Douwes, 2020). It also helps in reactivating risk management for minimizing the impact as well as the likelihood of occurrence of the project. this tool is also used as a communication tool for ensuring the potential risk of the stakeholders of the company. This tool is also useful for controlling the potential risks in the organization that need to be monitored and controlled as well as supporting the decision of past projects. It is also helpful for serving the valuable resources that could be used as a lesson for compliance with the contractual as well as legal obligations of the company (Gilfedder et al., 2021). The register tool is very effective as It helps in contributing to the successful project that could be delivered within the project based on the established constraints of the company.
The construction process is organized in a detailed land in different phases that would give the specific requirements of the task, activities as well as the timeline of the project. The detailed program follows a plan as well as a design that is designed in particular stages and it is very important for completing the project successfully. there are different features that are included in the task for the breakdown of the construction process so that it could work from the initial state properly. The design is also used for allocation of the resources, sequencing the tasks, precising the timelines controlling the quality measures, and creating efficient project control (Steen, 2023). It is also used for considering the health as well as safety measures that could be used for communication as well as monitoring for adapting the changes required in the construction of the building. The program also shows that it would efficiently use the resources properly by checking the quality standards of the safety measures that could ultimately contribute to the successful completion of the building project.
Discussion
The planning as well as organization of the physical space of the construction side is a very important method for constructing the project management as it helps in enabling the safe as well as effective execution of the project. This also helps in encouraging construction activities, managing the resources, and creating the safety standards method that could be based on a well-structured and ordered environment (Falk, and Hagsten, 2023). There are several factors as well as actions that could be used for the layout planning of the site like the purpose of the projects, legal requirements of the construction site, evaluating the site, accessibility of the construction area, considering the safety measures, handling the material storage, utility services, and equipment used. Tunnel formwork is also used by the project manager for building. The structures of the construction site as it helps in utilizing different units among the interior of the building like apartments as well as the bacon species in the building. The tunnel formwork will be using the reinforced concrete method that helps in allowing the project manager for ensuring the quality as well as the speed of the construction process for building the site (Hansen-Lohrey et al., 2023). The construction process could be completed based on the tunnel formwork for completing the construction building within a limited time as it uses the reinforced concrete method.
References
Falk, M.T. and Hagsten, E., 2023. Threat Perception and Adaptive Capacity of Natural World Heritage Site Management. Environmental Management, 71(2), pp.285-303.
Gilfedder, L., Appleby, M.W., Lechner, A.M., Sprod, D., Carter, O., Burgess, S., Davidson, N.J. and Harris, R., 2021. Tasmanian Midlands: A case study of increasing sophistication in conservation planning and action over four decades. Ecological Management & Restoration, 22, pp.11-23.
Hansen-Lohrey, C., McDonald, J., Richardson, B., Boulot, E., McCormack, P. and Hilkemeijer, A., 2023. Development Assessment Panel (DAP) Framework Position Paper.
King, S. and Leach, A., 2021. Architectural History and the Material Geographies of the Colonial Tasman World. Architectural Theory Review, 25(1-2), pp.28-41.
King, S., 2022. The Architectural Imagination and the Colonial Tasmanian Homestead. Fabrications, 32(1), pp.31-53.
Nath, S., Dewsbury, M. and Douwes, J., 2020. Has a singular focus of building regulations created unhealthy homes?. Architectural Science Review, 63(5), pp.387-401.
Steen, A.P., 2023. Deconstruction in Tasmanian New Heritage Architecture. The Journal of Architecture, pp.1-23.