Enjoy Upto 50% OFF on Assignment Solutions!
Tempo Office Building Redevelopment: A Modern Construction Case Study By Native Assignment Help.
Ph.D. Writers For Best Assistance
Plagiarism Free
No AI Generated Content
Are you in need of online assignment help in the UK with a free case study? Look no further than Native Assignment Help. We have a dedicated team of professionals committed to delivering customized support for your academic needs and ensuring you get excellent marks on all your assignments.
The study will conduct on the specific case study which defines the redevelopment construction project of the Tempo office building in Maidenhead. This building presents a high design of modern construction work as well. So, this project will disclose the redeveloping part through the construction work by the ISG Limited. Actually, this building is a legal and general investment building so the” Legal and investment management real Assets” has appointed the ISG which refers to the “Interior service group” for redevelopment construction work in the cost project of 40 million euros. The redevelopment structure was constructed as 112000 sq ft. for the former office building in the standard structure with the two-story building. Actually, the Tempo project belongs to the kinds of principles such as them, the building made with the old demolition to the modern new greenest buildings. So, as per the environmental factors the construction company used the Net Zero carbon operation factors which are based on the new principle to redevelop the buildings. According to that, the total energy consumption of 130K Wh/sqm/yr. Here the roof of the house installs the low energy technology including the 5000 sqft with the solar panel and heat pump technology for the air source which achieved a 39% reduction of the carbon emission of this specific building. So, the study will establish the analysis part of this specific case study's factors. In construction work, contractors and managers play the vital role to execute the whole construction project as well. So, here manager will assist all the work structure with the IT approaches such as “IoT and BIM” both are mostly accurate models to recreate the constriction part more effectively and accurately on time with maintaining all of the stakeholders and risk factors as well.
The construction project must be analyzed by such kinds of factors also depending on the strengths and weaknesses. So, this question also elaborates on the strengths and weaknesses of the business model canvas for the redevelopment existing Tempo project. Actually, the ISG Limited will draw the whole work format design for the work performed and improvement factors so they must need many suggestions for the construction model. The manager suggests such kinds of factors throughout the construction work and clarifies the whole team using the business model canvas.
Figure 1: Tempo building project
Key stakeholders
The key partner of this Tempo redevelopment construction project is one of the interior organizations of ISG. This organization works on the business model canvas as well.
Key Activities
The activity of the building purpose is the redevelopment of this construction with old demolition.
Value Propositions
- Increase safety
- Improve public transit flow
- Improve the green space
- Increase aesthetic appeal
- Enhance economic development
- Enhance the energy efficiency
- Environment sustainability
Customers Relationship
- Signifies the potential customers
- Relationship building
- Trust establishing
- Loyalty creating
- Check feedback
Customer Segments
- Value proposition
- Customer relationship
- Key partner
- Cost structure
- Revenue stream
Key Resource
- Financial resource
- Skill labor
- Materials
- Permits and regulation
- Time
- Expertise
Channels
- Architect
- Suppliers
- Contractors
- Local government
Cost Structure
- Labor cost
- Materials cost
- Permit cost
- Insurance cost
- Legal cost
- Overhead cost
Revenue Streams
- Cost savings
- Materials sales
- Project fees
- Lease payment
- Property tax
- Advertising revenue
The business model canvas is a tool for identifying the advantages and disadvantages of a business model. As a diagram of the core components of a business, it is used to identify areas of potential and risk. The business model canvas is divided into nine areas, each of focusing on a distinct component of the organization.
When assessing and defining the advantages and disadvantages of the construction of the Tempo office building, the business model canvas can help in identifying potential risk and opportunity areas. So, the value proportion factor might be used to highlight the exceptional value that the work will offer clients (Mokoena et al. 2021). The Customer Relationships factor can be utilized to determine how the project will engage with customers, while the Revenue Streams factor can be utilized for identifying prospective revenue streams. The tasks that need to be completed in order to complete the project can be determined using the Key Activities and Key Resources components. The resources needed to complete the project can be found using the Key Resources component. This might help find any potential problems or stoppages with the project. The business model canvas may be used to assess and determine the advantages and disadvantages of the Tempo office building construction project. It can be used to identify the work process which can be used through this factor to execute the whole of the construction redevelopment work. Thus, this redevelopment construction project depends on the energy emission with the green environmental progress so this project must utilize the model canvas according to the project manager's decision.
For execution purposes the ISG limited needs such suggestions to maintain all of the work with accuracy and meets all requirements. So, to complete the redevelopment of the Tempo office building project, ISG should think about utilizing a range of tactics. They must, first and foremost, ensure that all internal and external stakeholders are aware of the project’s plans. This entails ensuring that the project’s scope and objectives are distinct, as well as developing a budget and schedule that are accepted by all parties. They should also make sure they have the right staff, materials, and tools to complete the project on schedule and within their projected budget. Finally, they should make sure that all stakeholders have a clear line of communication established and that any risks are identified and attended to.
To ensure that the project is successfully completed, ISG must also implement a strong risk management process (Nosratabadi et al. 2019). This will help in identifying and mitigating all possible project risks, including changes to the budget or scope, a delay in the supply of materials, or problems caused by the weather. Also, swiftly detect and fix any concerns, ISG should also ensure that all stakeholders have a connection to a means of communication. ISG needs to make sure that there are systems in place for monitoring and reporting, so that performance can be tracked and possible problems can be addressed immediately away.
By utilizing these tactics, ISG will be in a good position to effectively complete the reconstruction of the “Tempo office building construction project”.
For the work performance improvement and enhancing all of the work progress to achieve the canvas framework activities as well so, the below list will disclose all of the factors,
During the construction of Tempo buildings works, the contractor and the nature of the construction company make a difference to use the canvas plan which means that the contractors must be able with the flexibility to respond quickly to change the project requirements as well. The canvas for the Tempo building project must be customized to the particular needs of the contractor and the project. For instance, a contracting business would need to use supplies or methods not included in the canvas. Different project management techniques and more resources can be required as a result (Polydoropoulou et al. 2020). The canvas must be altered as a result to satisfy the contractor’s specific specifications. The construction business should also take into account any prospective environmental restrictions or safety rules that can have an effect on the project while constructing the canvas. The canvas framework must be customized to the specific needs of the contractor and project nature in order for the Tempo office project to be successful.
According to Mokoena et al. 2021, the manageability of encouraging organizations in an emerging economy of Tempo project business in Maidenhead is taken into consideration. A review of the literature that examines the social, organizational, and financial facets of sustainability will be conducted. Also, it will consider how a business model canvas framework might benefit local companies. The survey will examine this methodology’s advantages and disadvantages as well as its potential for success in a developing economy. The audit will also take into account any potential challenges as well as how the structure might be used to identify promising development opportunities. The review’s ultimate goal is to demonstrate how effectively a business model canvas framework may aid advertising firms in maintaining a profitable operation in a developing market.
According to Nosratabadi et al. 2019, because companies and project teams are looking for ways to lessen their effect on the environment while still satisfying the needs of their consumers, sustainable business models are growing in popularity in the construction sector. “The Business Model Canvas (BMC)” is a tool that may be used to rebuild and redevelop building projects in a sustainable way. “Key stakeholders, cost structure, customer categories, value propositions, relationships with customers, channels, key resources, key activities, and revenue streams” are the nine elements that make up the BMC. By focusing on each of these components, a project team can find potential chances to lessen the environmental effect of their project while still satisfying the needs of the client. By examining important resources and activities, the team might identify strategies to cut back on the project’s usage of resources and environmentally harmful activities. By exploring important stakeholders and cost structures, the team might identify possible stakeholders who could offer environmentally friendly products or services at a reduced price. Ultimately, by looking at revenue streams, the team could discover prospective sources of revenue that are linked to sustainability.
Conclusion
The summarization factor of this particular aspect of this Tempo construction project is based on the business model canvas. Through this typical and effective model, the ISG limited goes on with the specific activities as well.
The Tempo redevelopment construction office building which depends on such kinds of factors as “contractors and key trade contractors” both refers to the “design, specification, control, payment, and service”. Thus, the existing four-storied building creates a sustainable office of a total of 11000 sqft, so all of the specific factors must be accurate to develop the greenest buildings in Thomas Valley. So, the ISG limited must be aware of the relationship with the specific group. Because depending on the relationship factors the construction limited can operate all of the important factors w without the hazards and risks. Among that, the limited must be used the supply chain approach and risk management strategy to evaluate work progress with the economic factors and mitigate the risk of the existing project.
ISG Limited understands the importance of direct relationships between a “contractor and key trade contractors” in the Tempo office complex in Maidenhead. This is extremely important to make sure the project is finished efficiently and effectively. When two people work together, they are better able to understand each other’s needs and requirements, which leads to more effective collaboration and improved outcomes for both parties. This is particularly crucial thus working on challenging projects of the Tempo office building since it ensures that all significant trade contractors are cooperating to produce the desired outcome. It is also important to make sure that all relevant safety precautions are taken and that this project is done as fast and efficiently as feasible. ISG Limited is aware of the value of these interpersonal relationships in securing the completion of the redevelopment construction to demolish the old function to modify new models with various kinds of IT features.
Using techniques and methods both approaches are most valuable for managing the whole work performance with maintaining accuracy in the supply chain management and risk includes “predictive analytics, process mapping, risk assessment, inventory management” (Dulaimi et al. 2020). The usage of “Production network permeability tools, like RFID labeling”, can be used to monitor the flow of materials, follow deliveries, and spot potential delays. Also, the use of frameworks and electronic information interchange can help to streamline operations and reduce the need for human information access. So, the usage of collaborative dynamic tools, including cloud-based project management systems, takes into account improved communication and coordination among all involved parties.
To analyze all of the specific factors which are disclosed in this section that is more discussed on the ISG maintenance and verification ways. The need for immediate relationships between “key trade contractors and contractors” for hire in relation to “design, specification, control, payment, and service” in project development work is something ISG is well aware of. ISG is aware that a development project’s success depends on the nature of the relationship between specific indicators. With its key trade contractors available for hire, ISG is focused on developing and maintaining significant areas of strength to ensure that all development work is completed to the highest standard.
ISG is concentrating on ensuring that the “contract’s specific, control and portion tactics” are transparent and equitable for the essential choosing employees for hire. To ensure that the project requirements and the construction cycle are optimal and accurate, this is crucial. ISG is aware that it is critical to maintain communication between two different factors for hiring so that all parties are up to date on the status of the advancement project and that any difficulties can be resolved when they arise.
ISG Limited ensures the highest quality product and services through key trade contractors. They require to complete the project to the standard expected. This includes giving the business project staff access to the necessary tools and resources, as well as providing appropriate and accurate feedback and payment (Tah et al. 2021). This includes providing ongoing service and preparation, as well as making sure that the payment and administration procedures for the project. So, the relationship between the factors must be important in the Tempo office building project plan execution. For this reason, this research also elaborates and signified all of the features that belong to the relationship between the “contractors and key trade contractors” as well through specialization.
Thus Tempo construction project is a large mad modular project with the greenest modification sustainability so, the maintains the various kinds of techniques and methods to develop the supply chain of this construction to mitigate the risk factors as well. The specific factors of methods which is exactly used in this specific project such as “predictive analytics, process mapping, risk assessment, inventory management”.
Figure 2: Tempo methods
To promote the development supply chain and manage critical risks associated with building development, a predictive analysis approach can be used. ISG organizations are better prepared to identify and manage risks associated with supply network tasks by predictive analysis. It can help with spotting possible problems early, thinking of proactive responses, and avoiding excessive deferrals. The development cycle can be used to identify designs, taking improved scheduling and asset work into consideration, by using specific analytical techniques. This will help to limit risk and ensure the effectiveness and practicality of the development inventory network.
Process mapping methodology can be used to support development supply chains and help clients manage their major risks related to Tempo building development. This strategy involves visualizing the cycle and breaking down the interplay between developments into discrete advances. This enables clients to have a deeper understanding of the many stages involved in the building cycle and how they are connected (Meng, 2019). Clients can identify risky regions and develop methods to reduce those threats by outlining the inventory network process. This ensures that the project is completed on schedule and within budget.
The risk assessment method can be used to support development supply attachments to oversee major risks associated with specific office building projects. Using this cycle, the client can identify and evaluate expected task risks, focus solely on the work risk, and determine how to mitigate them (Tah, 2021). This includes assessing the “financial, legal, practical, and risk factors” associated with the various suppliers and subcontractors involved in the project. The client should feel secure knowing that the appropriate resources are being sent to the appropriate suppliers and that everyone in the construction network is working together to reduce the risk of any surprising delays or problems.
Inventory management strategies are used to support supply chain development so that clients can manage their major risks and accelerate building development. This strategy gives the clients the opportunity to manage the entire supply chain from purchase to delivery, giving them visibility and control to ensure a simple and successful completion of the project. Also, it provides a mechanism to “monitor stock levels, identify expected risks, and specify quality assurance procedures” (Benton et al. 2020). This helps the client ensure that the appropriate resources are available when needed and that any problems are addressed quickly. This strategy helps reduce the cost of development materials and improve the effectiveness of the inventory network.
So, here elaborates all of the methods and techniques which must be enlisted to execute the redevelopment of the modified four-storeyed building as a Tempo office building construction project.
According to Shaikh et al. 2020, according to the results of the literature research titled “The Role of Collaboration and Integration in the Supply Chain of the Construction Industry”, cooperation and integration are essential elements of a successful supply chain. According to research, a collaboration between stakeholders and the combining of different cycles leads to increased productivity, lower investment costs, and better asset management. The drafting inspection also reveals that collaboration and incorporation consider greater interaction and collaboration between stakeholders. Also, considers streamlined work procedures, improved quality control, and increased efficiency. It implies a supply chain that is integrated can be used to enhance project delivery, client happiness, and customer service.
According to Meng 2020, proactive management in the framework of construction supply networks, the techniques and practices that help in enhancing the efficiency of supply chains and reduce risk in building projects are looked at. It focuses on how proactive management can lower project-related risks and increase supply chain efficiency. It also examines the application of proactive management practices in several building industries, such as “the steel and concrete supply chain”, to find best practices and potential areas for improvement. The report also examines how proactive management affects the efficiency, cost, and customer retention of the production network.
Conclusion
The Tempo project will be established with a flexible workplace and create outdoor areas and internal atriums to maintain a smarter sustainability office in 21500 sqft space. So, this construction project must maintain the supply chains to mitigate all types of risk factors by the ISG management. For this reason, this section elaborates on the highly effective process or way to create smarter construction work. Because, depending on the supply chain, the construction transportation option, and secure storage all behave more effectively in this project which refers to the 153 cycles as well. So, to meet all of the smarter requirements the ISG limited fixed it to maintain the work performance.
The Tempo construction project is an old-fashioned project as well so the ISG limited contract smarter and modular through the four-story building to demobilize the old function. Thus, these office floors combined with such kinds of sections as “workspace, outdoor areas, rooftop pavilion, and the roof terraces” all depend on the smart work as well. Among that, this building also contains some facilities which are a “public cafe, outdoor class facility, health, and wellbeing ambitions, changing room, high-quality shower and locker with the cupboard”. So, to maintain all of the construction facilities, ISG Limited must maintain the new technology system for the work performed effectively. This limited use of the “BIM” technology for maintaining all of the work progress quickly and accurately.
Thus, this construction work process must be a technical development process so the ISG used such kinds of modular applications which is exactly enhance their accuracy and smarter in the current world. So, this construction project used the “Bim application” to secure moderate work and help to improve the work process bt the contractors. Depending on that, contractors can see the complete building process from beginning to end with a “BIM (Building Information Modeling)” 3D computer model (Shaikh et al. 2020). It helps the various stakeholders engaged in the construction project communicate better and identify possible problems before they become expensive ones. With BIM, contractors may more effectively track and manage their resources, assuring that the project is finished on schedule and within their projected budget. Using virtual models of the building, contractors can test different scenarios and enhance their construction process by using BIM. By utilizing BIM during the construction of the Tempo office building, contractors may facilitate their “procedures, reduce costs, and provide outcomes” of the highest caliber.
Figure 3: BIM application for smarter construction
Among the BIM, “ICT, or Information and Communication Technology”, can enhance the performance of contractors. ICT can be used to produce accurate estimations, manage client connections, collaborate with workers, track, and manage projects and activities, and increase productivity (Meng, 2020). ICT enables project work to automate their processes, streamline communication and teamwork, and shorten project turnaround times. Moreover, contractors may track customer contacts and generate estimates and invoices more quickly and accurately by using ICT. ICT can also be used to track project progress, monitor budget and control costs, and enhance communication. It can be used to monitor and track health as well as compliance with rules and norms.
In the analytical process, the Tempo project uses the BIM application to improve the work performance of the ISG contractors. “BIM (Building Information Modeling)” systems are becoming more and more used in the construction sector as a way to improve project overall efficiency. BIM applications can assist a contractor in a number of ways to enhance their Tempo project procedures.
Here, using BIM technologies to improve their Existing project procedures may benefit contractors. Employed workers can work on improving the project’s overall competence and lowering the risk of expense overwhelms with the aid of “3D models, information research, and collaboration tools”.
The Tempo building construction project defines the aspects of ICT which refers the “Information and Communication Technology” (Collao et al. 2021). To improve the enhance the work performance ISG Limited requires the ICT methods aspects which are significant to the contractor’s performance with the use of “cloud computing”.
The contractor can save project data in cloud computing from any location. Teams and contractors can collaborate more easily and have greater access to project data as a result. Because of cloud computing, the client already has immediate access to the project data, enabling them to take quicker choices based on more data. As a result, the contractor has indeed been able to adapt to changes in the process and decision more swiftly and efficiently, leading to enhancement. Due to the fact that all project data is stored in the cloud, distributed computing has also allowed the contractor to reduce the amount of desk work associated with the project. This has reduced the amount of time spent on official tasks, allowing the employee for hire to concentrate their efforts on the Tempo project (Cho et al. 2020). The project operator has also had the option to use the “software as a service (SaaS)” applications, enabling them to access tools and services that would otherwise be challenging to set up and maintain on location. The use of cloud computing has also given the project worker the ability to improve communication across teams and contractors. This has enabled the hired worker to collaborate more successfully, enabling different groups to communicate efficiently.
So, according to this Tempo project, the contractors use could computing through information and communication factors. Thus, through this ICT technique, the whole project will be analyzed by the work performance and progressive report depending on the communication factors as well.
The ISG limited contractors use the IT provision the delivered value to their clients of “Legal and General Investment Management real assets”. An effective and clear approach to handling the task can be provided by an IT arrangement, giving the client a high-quality outcome. The contractor should think about using risk in the executive framework to complete the operation. This will give the client detailed information about how the project is progressing and the resources that are being used. Also, it will make the “budget, timeline, and risks” involved in the project transparent (Ratajczak et al. 2019). The employee-for-hire should also take into account using reports from the executive framework to keep and distribute project records. The client will find it easier to follow and obtain project data as a result. The ISG contractor should also take into account using a cloud-based system to store and view project data. The client will then have a safe and reliable way to access the information. The project work should also take into consideration using a correspondence platform to manage correspondence with the client. This will ensure that the client is continuously informed of the project’s status and any necessary advancements. Considering everything, an IT setup can give the employee for hire a skilled and useful approach to doing the task and add value to the client.
According to Tang et al. 2019 “Building Data Modelling (BIM) and Web of Things (IoT)” devices are the focus of this paper’s writing assessment. It looks at both the potential benefits of such a combination and the challenges that might arise. It summarizes the current state of craftsmanship and considers recent contextual analyses and explorations that have been conducted on the subject. It also discusses the anticipated opportunities that this reconciliation may provide, such as increased “information accuracy, cost savings, and improved proficiency”. It examines the potential security risks associated with this combination as well as the need for further investigation.
According to Li et al. 2021, the “Green Development Assessment Framework’s” writing review in light of BIM Dispersed Cloud computing examines how distributed cloud services can be used to improve the use of “Building Data Modelling (BIM)” for green development. It examines current research on BIM and green development as well as the frameworks used to analyze green development. To assess possible improvements that can be accomplished by utilizing distributed cloud administrations, it takes into account aspects like “cost, time, and information accuracy”. It implies that delivered cloud services can give frameworks for evaluating green development “better performance, cost savings, and increased information accuracy”.
Conclusion
The Tempo building project has benefited from the use of “BIM, ICT, and IT provision”. The efficient management of data and information throughout the project has been taken into consideration when creating a computerized of building. The option to gain a deeper understanding of the project, its objectives, and the structure’s components using 3D perception and computer-generated reality. Better communication between the plan, development, and tasks groups, as well as increased cooperation and coordination, have all been made possible by BIM. The use of ICT has taken into account the blending of data from many stakeholders, making it possible to track and monitor the task from its inception to completion. As a result, task execution and cost investments have become more effective.
In the Tempo building project, the ISG contractor chooses the construction stakeholder such as the “project manager, the customers, the suppliers, and the shareholder”. The ISG limiter hired should make sure they are aware of both the client’s goals and the project’s goals. They should have the choice to effectively communicate with the clients and make sure they understand their needs and presumptions. Also, they should be able to identify any potential problems that may arise throughout the course of the project and develop strategies to manage them. Also, they should be able to decide how to create a clear schedule and budget for the project and how to keep the clients informed about its progress.
Stakeholder is a significant component of effective development projects, as it considers the fruitful finishing of a venture by figuring out the necessities and inspirations of every elaborate clients. On account of ISG contractors constructing the Tempo project was an “enormous scope, high-profile project” with different stakeholder that should have been made due. The client had clear assumptions for construction the project on time and inside financial plan, while the nearby local area had interests in the ecological and smarter impacts of the task (Wood et al. 2021). So, the ISG limited guarantee that the undertaking was conveyed to the client’s fulfillment while likewise guaranteeing that the nearby local area’s interests due to the different stakeholders. To deal with these stakeholders, ISG project workers utilized various methodologies.
Figure 4: Various kinds of Stakeholders
All stakeholders in the Tempo project are ready for the fruitful execution of the task for various reasons. The task supervisor is obtained on the undertaking’s effective finishing since it is their obligation to guarantee the project is finished to the client’s details, on time, and inside the financial plan. Thus, all of the stakeholders such as “the project manager, the customers, the suppliers, and the shareholder” are communicate with the contractors to execute the Tempo project. Firstly, Thus, this is the smarter and modification building to the old fashioned so must be needed and communicate all of the stakeholders as well. Actually, this is the 112000 sqft work process building structure that follows sustainability with energy consumption (Stanitsas et al. 2021). So, as the stakeholder of a project manager has to maintain all of the work progress effectively and on time depending on the work performance. After that the shareholder, suppilers who are also being interested in this Tempo project execute the work space according to the project execution by the ISG contractors. Thus, this specific building is the office floor building so must be opening spacing for the customers so the customer’s stakeholder must be needed to manage and execute of the work according the “Legal and General Investment Management real assets”.
Stakeholder management for the Tempo construction project would begin with the ISG contractors determining who the stakeholders are and what their interests are. This would include leading meetings and exploration to acquire a comprehension of the project’s targets, as needs might arise and assumptions. The contractors would then create a strategy for managing stakeholders once they had been identified. Each stakeholder’s roles and responsibilities, as well as their expectations and engagement strategies, would be laid out in this plan. Also, potential conflicts and risks that may arise during the project would be included in the plan. Throughout the project, the ISG contractors would work to identify, engage, and manage stakeholders to ensure successful stakeholder management (Ashrafi et al. 2020). This would necessary to regular meetings with the stakeholders to discuss their concerns and expectations, as well as timely project updates and feedback. The contractors would also make use of a variety of communication methods, such as “social media, emails, and newsletters”, to keep stakeholders engaged and informed. To assure that the project will proceed according to plan and that each stakeholder will be satisfied with the outcomes. The ISG contractors would be tasked with resolving any disagreements that might arise between the various stakeholders involved in the project. They would work to ensure that the project benefits everyone and meets the expectations of all stakeholders.
Those with a stake in the project’s success are called stakeholders. Stakeholders in the Tempo project include “shareholders, customers, suppliers, and the project manager”. To ensure the project’s success, it is essential to take into account the distinct needs and interests of each of these stakeholders (Barrane et al. 2021). The project manager is in charge of running the operation of the project and is accountable for ensuring that each goal is accomplished on time and within the allotted budget.
The project manager should guarantee that the task is finished on time, inside spending plan, and fulfills every quality rule. The project manager will be in charge of coordinating with the customer and supplier stakeholders and ensuring that the project team is functioning effectively. The people who will make use of the product or service that the Tempo project is providing are the customers.
Customers will have high standards for “usability, dependability, and quality”. To ensure customer satisfaction, the project manager must ensure that these expectations are met. The clients will likewise be anticipating convenient conveyance of the item or administration, and should arrange with the provider partners to measure up to these assumptions. Those who will provide the project’s materials or services are known as the suppliers. To ensure that the materials and services are delivered on time and within budget, the suppliers must be taken into consideration throughout the project. With assure the project’s success, the project manager must also ensure that the suppliers provide high-quality products and services (Wuni et al. 2022). Those who have invested in the project and hope to receive a return are the shareholders. The task administrator should guarantee that the venture is finished on time and an inside the spending plan to limit the gamble of losing the investor’s speculation. To get the most out of the shareholder’s investment, the project manager must also ensure that the project meets all quality standards.
So, the “project manager, the customers, the suppliers, and the shareholders” Stakeholders with a stake in the Tempo projects success. To ensure the project’s success, the project manager must ensure that all stakeholder’s needs and interests are taken into consideration.
All stakeholder’s interests were taken into consideration as the Tempo project was managed. To identify and take into account the interests of all stakeholders, the project team worked closely with them. Stakeholder’s ideas and perspectives were taken into account and included in the decision-making process. The group likewise attempted to guarantee that all clients approached data about the task and that their criticism was thought about all through the undertaking (Vuorinen et al. 2019). This included regular meetings with stakeholders to make sure their input was taken into account during the project’s planning and execution. The undertaking group attempted to assure that all clients were kept educated regarding the task’s advancement, so they could give input and backing when required. The project team was able to adjust their approach if necessary while simultaneously ensuring that all stakeholders were pleased with the project’s outcomes. The Tempo project was managed with the needs of all of the clients involved in mind. All through the project, attempted to ensure that all clients got an opportunity to shout out and that their criticism was considered (Stocker et al. 2020). Thus, the group had the option to guarantee that the task was effective and that all partners were satisfied with its results.
According to de Oliveira et al. 2019, the significance of project management is the focus of Stakeholder Management Influence on n a Project. It investigates the manners by which clients the executives can influence trust, how trust can be created and kept up with, and on effective project results. It looks at how trust affects project performance and how trust can be used to manage stakeholders. The literature review also examines the significance of involving stakeholders in the project process and the role that communication and collaboration play in building project. The review investigates the possibility of enhancing project success and the connection between trust and project success.
According to Safapour et al. 2019, to comprehend the connection between communication and project success and to identify communication indicators that can be used to measure project success, the study “Identifying Effective Project-Based Communication Indicators within Primary and Secondary Stakeholders” in Construction Projects looked at a variety of secondary sources, including books, journals, and online resources. It found that effective communication indicators should be identified and monitored to ensure a successful outcome, and that communication plays a significant role in the success of construction projects. It also brought to light the need for additional research to create a comprehensive set of communication indicators. That can be used to measure project success and the significance of taking into account both primary and secondary stakeholders when evaluating communication effectiveness.
Conclusion
The findings is that maintaining communication between all involved stakeholders is necessary to maintain stakeholder factors in Tempo construction projects. This should be possible by routinely refreshing clients on investigate of the task, ensuring that all assumptions are met, and that any issues are tended to rapidly. It is essential to ensure that the project is managed effectively and that all stakeholders are able to contribute. Tempo Construction Projects will be able to maintain stakeholder satisfaction by taking these steps.
Native Assignment Help is your go-to source for all construction assignment needs. Our team of experienced professionals is committed to providing high-quality, customised solutions that meet your academic requirements. Get the best help and succeed!
Conclusion
The whole project summarization which is mostly compacted with the various kinds of factors, all are assigned this report file as well. To disclose all of this perimeter which is mainly used and maintain the work process and the related factors. So, according to the project file, it is compacted with the Tempo office building project which has fore-storied building floor but is consist with the old applications and fashioned. Now, the Tempo legal authority who appoint the ISG limited contractors to constructs the new module building depends on the IT applications like BIM which is the most applicable application the current days to improve and enhance the whole work progress and maintain the work process easily and accurately. Among, that, the main specific factors of the big project must be enlisted the various kinds of stakeholders and their relationship with the ISG contractors. In last, to explaining the Tempo project execution process and maintain format in the construction work ways to meet all the clients requirements with the energy consumption and green sustainability project as well.
References
Journals
Ashrafi, M., Walker, T.R., Magnan, G.M., Adams, M. and Acciaro, M., 2020. A review of corporate sustainability drivers in maritime ports: a multi-stakeholder perspective.Maritime Policy & Management,47(8), pp.1027-1044.
Barrane, F.Z., Ndubisi, N.O., Kamble, S., Karuranga, G.E. and Poulin, D., 2021. Building trust in multi-stakeholder collaborations for new product development in the digital transformation era.Benchmarking: An International Journal,28(1), pp.205-228.
Benton, W.C. and McHenry, L.F., 2020.Construction purchasing & supply chain management. New York: McGraw-Hill.
Cho, S.I., Lim, J.H., Lim, S.B. and Yun, H.C., 2020. A study on dem-based automatic calculation of earthwork volume for BIM application.Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography,38(2), pp.131-140.
Collao, J., Lozano-Galant, F., Lozano-Galant, J.A. and Turmo, J., 2021. BIM Visual programming tools applications in infrastructure projects: A state-of-the-art review.Applied Sciences,11(18), p.8343.
Dao, Q.V., 2021. A case study of BIM application in a public construction project management unit in Vietnam: lessons learned and organizational changes.Engineering Journal,25(7), pp.177-192.
de Oliveira, G.F. and Rabechini Jr, R., 2019. Stakeholder management influence on trust in a project: A quantitative study.International journal of project management,37(1), pp.131-144.
Dulaimi, M.F., Y. Ling, F.Y., Ofori, G. and Silva, N.D., 2020. Enhancing integration and innovation in construction.Building research & information,30(4), pp.237-247.
Fargnoli, M. and Lombardi, M., 2020. Building information modelling (BIM) to enhance occupational safety in construction activities: Research trends emerging from one decade of studies.Buildings,10(6), p.98.
Fitriasari, F., 2020. How do Small and Medium Enterprise (SME) survive the COVID-19 outbreak?.Jurnal Inovasi Ekonomi,5(02).
Gamil, Y. and Rahman, I.A.R., 2019. Awareness and challenges of building information modelling (BIM) implementation in the Yemen construction industry.Journal of Engineering, Design and Technology.
Jin, Z., Gambatese, J., Liu, D. and Dharmapalan, V., 2019. Using 4D BIM to assess construction risks during the design phase.Engineering, Construction and Architectural Management.
Khanzadi, M., Sheikhkhoshkar, M. and Banihashemi, S., 2020. BIM applications toward key performance indicators of construction projects in Iran.International Journal of Construction Management,20(4), pp.305-320.
Li, Y., Gao, X., Liu, X., Zhang, R. and Wu, Y., 2021, April. Green Construction Evaluation System Based on BIM Distributed Cloud Service. InIOP Conference Series: Earth and Environmental Science(Vol. 760, No. 1, p. 012055). IOP Publishing.
Marefat, A., Toosi, H. and Mahmoudi Hasankhanlo, R., 2019. A BIM approach for construction safety: applications, barriers and solutions.Engineering, Construction and Architectural Management,26(9), pp.1855-1877.
Marrero, M., Wojtasiewicz, M., Martinez-Rocamora, A., Solis-Guzman, J. and Alba-Rodríguez, M.D., 2020. BIM-LCA integration for the environmental impact assessment of the urbanization process.Sustainability,12(10), p.4196.
Meng, X., 2019. The effect of relationship management on project performance in construction.International journal of project management,30(2), pp.188-198.
Meng, X., 2020. Proactive management in the context of construction supply chains.Production Planning & Control,31(7), pp.527-539.
Mokoena, A., Prinsloo, J.J., Gawlik, R. and Pelser, T., 2021. A framework for the sustainability of advertising agencies in an emerging economy: the case of South Africa.Journal of Marketing Communications, pp.1-21.
Nosratabadi, S., Mosavi, A., Shamshirband, S., Zavadskas, E.K., Rakotonirainy, A. and Chau, K.W., 2019. Sustainable business models: A review.Sustainability,11(6), p.1663.
Polydoropoulou, A., Pagoni, I., Tsirimpa, A., Roumboutsos, A., Kamargianni, M. and Tsouros, I., 2020. Prototype business models for Mobility-as-a-Service.Transportation Research Part A: Policy and Practice,131, pp.149-162.
Ratajczak, J., Riedl, M. and Matt, D.T., 2019. BIM-based and AR application combined with location-based management system for the improvement of the construction performance.Buildings,9(5), p.118.
Safapour, E., Kermanshachi, S., Kamalirad, S. and Tran, D., 2019. Identifying effective project-based communication indicators within primary and secondary stakeholders in construction projects.Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,11(4), p.04519028.
Shaikh, F.A., Shahbaz, M.S., Din, S.U. and Odhano, N., 2020. The role of collaboration and integration in the supply chain of construction industry.Civ. Eng. J,6(7), pp.1-489.
Stanitsas, M., Kirytopoulos, K. and Leopoulos, V., 2021. Integrating sustainability indicators into project management: The case of construction industry.Journal of Cleaner Production,279, p.123774.
Stocker, F., de Arruda, M.P., de Mascena, K.M. and Boaventura, J.M., 2020. Stakeholder engagement in sustainability reporting: a classification model.Corporate Social Responsibility and Environmental Management,27(5), pp.2071-2080.
Tah, J.H.M. and Carr, V., 2021. Towards a framework for project risk knowledge management in the construction supply chain.Advances in Engineering Software,32(10-11), pp.835-846.
Tang, S., Shelden, D.R., Eastman, C.M., Pishdad-Bozorgi, P. and Gao, X., 2019. A review of building information modeling (BIM) and the internet of things (IoT) devices integration: Present status and future trends.Automation in Construction,101, pp.127-139.
Urbinati, A., Landoni, P., Cococcioni, F. and De Giudici, L., 2021. Stakeholder management in open innovation projects: a multiple case study analysis.European journal of innovation management,24(5), pp.1595-1624.
Vuorinen, L. and Martinsuo, M., 2019. Value-oriented stakeholder influence on infrastructure projects.International Journal of Project Management,37(5), pp.750-766.
Wood, D.J., Mitchell, R.K., Agle, B.R. and Bryan, L.M., 2021. Stakeholder identification and salience after 20 years: Progress, problems, and prospects.Business & Society,60(1), pp.196-245.
Wu, L., Lu, W., Xue, F., Li, X., Zhao, R. and Tang, M., 2022. Linking permissioned blockchain to Internet of Things (IoT)-BIM platform for off-site production management in modular construction.Computers in Industry,135, p.103573.
Wuni, I.Y., Shen, G.Q., Osei-Kyei, R. and Agyeman-Yeboah, S., 2022. Modelling the critical risk factors for modular integrated construction projects.International Journal of Construction Management,22(11), pp.2013-2026.
Go Through the Best and FREE Case Studies Written by Our Academic Experts!
Native Assignment Help. (2024). Retrieved from:
https://www.nativeassignmenthelp.co.uk/tempo-office-building-redevelopment-a-modern-construction-case-study-23779
Native Assignment Help, (2024),
https://www.nativeassignmenthelp.co.uk/tempo-office-building-redevelopment-a-modern-construction-case-study-23779
Native Assignment Help (2024) [Online]. Retrieved from:
https://www.nativeassignmenthelp.co.uk/tempo-office-building-redevelopment-a-modern-construction-case-study-23779
Native Assignment Help. (Native Assignment Help, 2024)
https://www.nativeassignmenthelp.co.uk/tempo-office-building-redevelopment-a-modern-construction-case-study-23779
Strategies for Enhancing Service Recovery and Customer Experience The UK's...View or download
Quantitative Research Report Navigate through our assignment help offerings,...View or download
Supply Chain Resilience and Sustainability: Unilever's Strategic Approaches and...View or download
Vodafone Plc: Dividend Discount Model and CAPM Analysis Are you in need of...View or download
Accorhotels Digital Transformation: A Strategic Response To Hospitality...View or download
Sustainability In Logistics & Operations Management At Nestle Company The...View or download
Get your doubts & queries resolved anytime, anywhere.
Receive your order within the given deadline.
Get original assignments written from scratch.
Highly-qualified writers with unmatched writing skills.
We utilize cookies to customize your experience. By remaining on our website, you accept our use of cookies. View Detail
Hi! We're here to answer your questions! Send us message, and we'll reply via WhatsApp
Please enter a messagePleae enter your phone number and we'll contact you shortly via Whatsapp
We will contact with you as soon as possible on whatsapp.
Ph.D. Writers For Best Assistance
Plagiarism Free
No AI Generated Content
offer valid for limited time only*